
XORTION Engineering GmbH
Stand: 4-SU4(Floor plan)
Mechanical engineering, construction and equipment
_Material flow: plastic
Process automation
Quality control, samples and research
_Material flow: paper / cardboard
Separation technology
_Material flow: textile
Digitalisation / Artificial intelligence (AI)
OPTIMIZATION of existing sorting systems
Sometimes existing systems need an extension or implementation of further equipment.
We analyze the requirements, identifies the deviations between the target and actual status and develops implementation plans to optimize your plant in a cost- and time-efficient manner.









