stand cover

Project Steel sp. z o.o.

Stand: 4-F52D(Floor plan)
Internal and external transport and equipment
Mechanical engineering, construction and equipment
Collectors
Maintenance
Process automation
_Material flow: biowaste
_Material flow: mineral materials
_Material flow: e-waste
_Material flow: feed and food
_Material flow: paper / cardboard
_Material flow: plastics
_Material flow: metal / scrap
_Material flow: wood
_Material flow: textile
_Material flow: rubber
_Material flow: sludge

Spoil Discharge Chute

Application: Chute designed to properly direct the stream of transported material within the transfer station, equipped with a replaceable wear-resistant liner. This version is mounted to the discharge head of the conveyor boom and allows positional adjustment in three planes.

https://project-steel.com/en/realizations/
product-image